Settlement Update— Posted January 14, 2021

After ten years of hard-fought litigation, the court entered an order granting final approval of an extraordinary and historic $100 million settlement with Knight-Swift Transportation Holdings for approximately 20,000 drivers who were misclassified as independent contractors who leased trucks from Interstate Equipment Leasing (IEL) to drive for Swift Transportation.

The court’s final approval order is available here.

The case is closed and Settlement checks have been mailed to participating class members. All checks were mailed by USPS to the address the claims administrator (Settlement Services, Inc.) has on file for each class member; there is no direct deposit available for this settlement, and no one will ask you for credit card or checking account information in order to receive your settlement check.

If you are an eligible class member and any of your contact information changes, please call the settlement administrator, Settlement Services, Inc., at 844-330-6991 to update your information.

Status Reports

Swift Settlement Update – Posted April 6, 2020

The settlement checks are scheduled to be mailed beginning today, April 6, 2020. Please be patient–U.S. Mail may be slower than usual due to the COVID-19 situation. If you have not received your check within three weeks (by 5/4/2020), please contact SSI.

If you need to update your mailing address or other contact information, please contact the settlement administrator, Settlement Services, Inc., at 844-330-6991.

Swift Settlement Update – Posted April 2, 2020

The Swift Transportation settlement is on schedule, and we do not anticipate any delays. Settlement checks are scheduled to be mailed beginning next week (April 6-10).

All checks will be mailed by USPS to the address the claims administrator (Settlement Services, Inc.) has on file for each class member; there is no direct deposit available for this settlement, and no one will ask you for credit card or checking account information in order to receive your settlement check.

If you need to update your address or other contact information, please call Settlement Services, Inc. at 844-330-6991.

Swift Settlement Update – Posted March 27, 2020

The defendant has made payment to the settlement fund.

We expect the checks will be mailed in mid-April 2020.

Please continue to check back here for further updates, and if any of your contact information changes, please call 844-330-6991 to update it.

Swift Settlement Update – Posted March 12, 2020

Because no appeals were filed, the settlement became effective on March 6, 2020.

We expect the checks will be mailed in mid-April 2020.

Please continue to check back here for further updates, and if any of your contact information changes, please call 844-330-6991 to update it.

 

Swift Settlement Update – Posted February 5, 2020

FINAL JUDGMENT AND SETTLEMENT TIMELINE

The court entered a final judgment on February 5, 2020. This judgment begins a timeline for the rest of the settlement process. The details of this process are set forth in the settlement agreement, available here.

  • Final Judgment entered today, 2/5/2020
  • 30 day Appeal Period ends Saturday, March 6th  (this is the “settlement effective date”).
  • 14 business days after the effective date, Thursday, March 26th, is the deadline for defendants to fund the Qualified Settlement Fund (“QSF”) (essentially, an escrow account controlled by the claims administrator).
  • The claims administrator, Settlement Services, Inc., will begin mailing out settlement checks within ten days after the funding of the QSF—Monday, April 6th.

We expect the checks will be mailed in mid-April 2020. Please continue to check back here for further updates, and if any of your contact information changes, please call 844-330-6991 to update it.

FINAL APPROVAL GRANTED! -- Posted 1/27/2020

FINAL APPROVAL GRANTED! — Posted January 23, 2020

After ten years of hard-fought litigation, on January 22, 2020, the court indicated it would enter an order granting final approval of an extraordinary and historic $100 million settlement with Knight-Swift Transportation Holdings for approximately 20,000 drivers who were misclassified as independent contractors who leased trucks from Interstate Equipment Leasing (IEL) to drive for Swift Transportation.

The court’s final approval order is available here.

We expect that settlement checks will be mailed to participating class members in early spring.

If you are an eligible class member and any of your contact information changes, please call the settlement administrator, Settlement Services, Inc., at 844-330-6991 to update your information.

Settlement Process

After almost ten years of diligent effort by the entire legal team at Getman, Sweeney & Dunn, Martin & Bonnett, and Edward Tuddenham, a class action settlement between the driver Plaintiffs and Defendants Swift, IEL, Moyes and Killebrew, has been reached.

CLICK HERE TO FILE A CLAIM

TO FIND OUT YOUR SETTLEMENT SHARE, CALL

SETTLEMENT SERVICES, INC. (“SSI”), at 844-330-6991

If the settlement is approved by the Court, it will resolve the claims of roughly 20,000 owner operator drivers (since 1999) in this case. The settlement cannot take effect until the Court approves it, and the approval process will consider comments from the affected drivers.

The settlement agreement was presented to U.S. District Judge John W. Sedwick, who granted preliminary approval. A Claims Administrator (Settlement Services, Inc.) has been appointed to send each driver affected by the settlement a Notice advising them of the terms of the settlement, what it will mean for them, how to file a claim in the case, how to withdraw, or object to the deal, and how to update your address so that you can receive your share of the proceeds. SSI will also set up a settlement website to give important information about the case and provide forms to Class Members, including claims forms and change of address forms. The Court has scheduled a final fairness hearing to consider the response of the class and whether to approve the settlement on January 22, 2020, at 10:00 a.m. at the Federal Courthouse in Phoenix, AZ. We are hopeful that if the settlement is finally approved it will result in payments early in 2020.

The Settlement Notice was mailed August 16, 2019. If you have not received a notice, please contact the claims administrator, Settlement Services, Incorporated (“SSI”), at 844-330-6991.

Please read your notice carefully—it includes important details about the case and the settlement, including your options and the deadlines to exercise those options.

If you have any questions or wish to make a claim, you may do so at the Swift settlement website, www.swiftmisclass.com or call SSI at 844-330-6991.

It is important that you keep your contact information up to date with SSI so that your settlement payment is sent to the correct address. If your notice was mailed to the incorrect address, or your contact information changes in the future, please call SSI at 844-330-6991.

Below are links to additional resources for drivers.

Settlement Services, Inc. (“SSI”) — Claims Administrator: 844-330-6991

www.swiftmisclass.com

Swift Settlement Agreement

Important Deadlines:

Notice Mailing Date: August 16, 2019

Filing/Postmark Deadline for Disputes as to Calculations: October 15, 2019

Fairness Hearing Date: January 22, 2020

 

 

Swift Settlement Update – Posted August 16, 2019

The Settlement Notice is scheduled to be mailed today, August 16, 2019. Due to the size of the class, it may take some time for class members to receive their notices. If you have not received a notice within a week or so, please contact the claims administrator, Settlement Services, Incorporated (“SSI”), at 844-330-6991.

When you receive your notice, please read it carefully—it includes important details about the case and the settlement, including your options and the deadlines to exercise those options.

If you have any questions, please call SSI at 844-330-6991 or navigate to the Swift settlement website, www.swiftmisclass.com

It is important that you keep your contact information up to date with SSI so that your settlement payment is sent to the correct address. If your notice was mailed to the incorrect address, or your contact information changes in the future, please call SSI at 844-330-6991.

Below are links to additional resources for drivers.

www.swiftmisclass.com

Swift Settlement Agreement

Important Deadlines:

Notice Mailing Date: August 16, 2019

Filing/Postmark Deadline for Disputes as to Calculations: October 15, 2019

Fairness Hearing Date: January 22, 2020

Settlement Notice Date and Final Fairness Hearing Scheduled – Posted July 29, 2019

We expect the notice of settlement to be mailed on or around August 16, 2019. The Final Fairness Hearing has been scheduled for January 22, 2020 at 10:00 a.m. at the Federal Courthouse in Phoenix, AZ.

JUDGE SEDWICK GRANTS PRELIMINARY SETTLEMENT APPROVAL - Posted May 8, 2019

Following a hearing held in Phoenix, AZ on April 18th, Judge Sedwick granted preliminary approval to the Settlement on April 22nd. Click here to see the Order Granting Preliminary Approval. Preliminary approval means that the Court has reviewed the settlement and considers it to be fair and reasonable at this stage. The approval order appoints SSI to act as Settlement Administrator and directs that SSI send notice to each affected class member informing them of their tentative settlement share and advising them how to make a claim or exclude themselves from the case, or how to object to the settlement. Getman Sweeney Dunn does not yet have the tentative share information, so please do not call, as the information is unavailable. Rather, wait until you have received your individual notice, which is due to be mailed mid-to-late June.

New Prime v. Oliveira Affirmed! - Posted January 15, 2019

On February 27, 2018, the Ninth Circuit stayed this case pending a decision by the Supreme Court in the New Prime v. Oliveira case, in which the Court considered whether the Federal Arbitration Act applied to interstate truckers. On January 15th, 2019, the Supreme Court reached a unanimous decision in truckers’ favor—ruling that truckers engaged in interstate commerce are exempt from the FAA under Section 1, regardless of whether their contracts call them contractors or employees. This means that, in most cases, truckers will not be forced into mandatory arbitration and cannot waive their rights to participate in class actions. Thus, the Supreme Court decision eviscerates Swift’s appeal of the District Court by claiming that the Court erred in finding the drivers to be employees, rather than contractors. It also means that the case should be back in full swing in the District Court after a long stay. Plaintiffs expect that the District Court’s order of January 6, 2017 will almost certainly be summarily affirmed and Swift’s appeal will be dismissed.

We will post more as new information becomes available.

Case is Stayed Pending Supreme Court Review of New Prime v. Olivera – Posted March 14, 2018

Because the Supreme Court has granted certiorari to (agreed to review) New Prime Inc. v. Olivera,the Ninth Circuit Court of Appeals has stayed Swift’s appeal of the Arizona District Court’s January 2017 Order (in which the District Court ruled that the case cannot go to arbitration because the named-plaintiff drivers were/are employees—not independent contractors—as a matter of law). Plaintiffs in this case relied upon the New Prime rationale as one of the reasons for affirming our District Court decision. Swift’s appeal has been removed from the court calendar and all related proceedings have been stayed until the Supreme Court decides the New Prime case.

The New Prime case held that the Federal Arbitration Act (“FAA”) Section 1 Exemption also exempts independent contractor agreements for workers in interstate transportation (such as truckers) from mandatory arbitration in federal courts. Courts are split on these issues, interpreting the law in different ways, and so the Supreme Court has agreed to hear the arguments and make final determinations on those issues. The New Prime case is not yet set for argument, but it will likely be during the October 2018 term—and a final decision on the issue will not happen until sometime after that.

In the meantime, the Ninth Circuit stay means that our case cannot proceed until these issues are resolved by the Supreme Court.

We will update this webpage as the situation develops further.

Oral Argument Date Set – Posted January 9, 2018

The 9th Circuit Court of Appeals has set March 16, 2018, at 9:30 a.m. PST to hear oral arguments on Swift’s appeal of the District Court’s January 2017 ruling that this case cannot go to arbitration because the named-plaintiff drivers were/are employees—not independent contractors—as a matter of law. Each side will have 20 minutes to present their argument and respond to the Judges’ questions.

Swift’s appeal does not dispute that the District Court reached the correct decision—that the Plaintiff drivers are employees under the law. Instead, Swift argues that the District Court erred by considering the Lease as well as the “Contractor Agreement” and the parties’ relationship in reaching its decision.

The Court will also hear arguments regarding Swift’s mandamus petition; Swift contends that the District Court should not have lifted the stay on discovery, granting Plaintiffs access to Defendant’s records of those drivers who may have claims in the case.

Drivers had argued, successfully, that because this case has been slowed down, hindered, and repeatedly delayed for years by the Defendant, the information in Swift’s records would not be current or useful if, or when, a Collective Action is certified and Plaintiffs asked for the records so that we could begin the process of ensuring that the contact information in those records is up-to-date and accurate in order to send notice to a group of over 16,000 drivers who may be eligible to join this case, if and when that should occur.

Typically, cases such as these are certified (or not) fairly early after filing and if certification is granted notice is mailed to all the people who might be eligible to join. Plaintiffs moved for collective action back in May of 2010— but this process was stopped in the summer of 2010 by Swift’s Motion to Compel Arbitration. Now that the Arizona District Court has ruled against Swift’s arbitration motion, and said that the case must remain in federal court, the next step after these appeals will be to revisit the class and collective action motions.

The 9th Circuit live-streams oral arguments, and archives them for viewing afterward. When a link to the live stream is available, we will post it here so drivers can watch the hearing live, or later, at a convenient time.

Parties Met for Mediation, Waiting on Hearing Date – Posted November 16, 2017

In September, Swift requested Plaintiffs’ attorneys to engage in the first settlement mediation—this is the first movement toward settlement negotiation since the case was filed. The parties held a mediation on October 21 in San Francisco, with a private mediator—Mark Rudy. While positions were discussed, no resolution was reached at that time and no further on-going discussions are currently planned. This is typical of complex cases such as this one. While GSD does not expect a quick settlement, we are confident of our chances of ultimate success in this case.

We are still awaiting a hearing date from the 9th Circuit Court of Appeals for oral argument, and will update the website when it is known.

Drivers’ Opposition to Swift Appeal Filed – Posted August 28, 2017

On July 24, 2017, the Drivers filed their opposition to Swift’s appeal of the District Court’s order finding that drivers are employees and thus exempt from arbitration. Also, the non-profit organization Public Justice filed a “Friend of the Court” brief in support of the drivers, to argue that the Federal Arbitration Act exempts all contracts of “employment” for workers in interstate transportation, no matter whether the worker is employed as a contractor or an employee. The Appeal is fully briefed.

Swift’s Appeal of Judge Sedwick’s “Misclassification” Ruling — Posted June 15, 2017

On May 24th, 2017, Swift filed an appeal to the Arizona District Court’s Order and Opinion (Jan. 2017) in which the District Court ruled that the five named-plaintiff drivers are employees, not independent contractors as a matter of law, for the purposes of § 1 of the Federal Arbitration Act. That ruling was important for many reasons — first, it prevented the case from being sent to arbitration, and second, the Court agreed with Plaintiffs that drivers are employees as a matter of law. Swift’s appeal does not dispute that the District Court reached the correct decision. Instead, Swift argues that the District Court erred by considering the Lease as well as the “Contractor Agreement” in reaching its decision. The drivers’ response to the appeal brief is due on July 24th, and Swift has until August 7th to file their response. Once the appeal is fully briefed the court may or may not assign a date for oral argument.

The Drivers have moved to renew (883) their Collective Action Motion (105), which is fully briefed by both sides, and have moved for Class Certification of a nationwide class of Lease Operators (884). If class certification is granted, notice will issue to all drivers who may have eligible claims. However, over Plaintiffs’ objections, the District Court stayed the case for the duration of the appeal. Plaintiffs moved the Court to lift the stay in order to require Swift to provide names and contact information for all drivers who may be able to participate in this case, and the Court required Swift to provide this information by June 19th.

Judge Requires Swift to Issue Corrective Notice — Posted February 27, 2017

On February 24th, US District Judge Sedwick found that Swift’s communication of a new contract was both “misleading” and “coercive.” The Court granted Plaintiffs’ request that Defendants send a curative notice for deceptive terms included in the new Contractor Agreement that it is requiring current lease operator “contractors” to sign. Judge Sedwick ruled that “Defendants are directed to send via Qualcomm the notice attached as Exhibit A to this order to those drivers who have been instructed to sign Swift’s new ICOA. The Qualcomm message with the notice shall be sent on three consecutive days, starting February 27, 2017. Defendants are also directed to send a copy of the notice via first class mail to those same drivers. Plaintiffs’ request to enjoin Defendants from engaging in future contact with putative class members regarding matters in this suit is denied as unnecessarily restrictive.”

EXHIBIT A

Dear Contractor:

IMPORTANT NOTICE TO ALL SWIFT CONTRACTORS REGARDING THE NEW ICOA

We understand there may be some concern and confusion regarding interpretation of certain provisions of the new ICOA issued on January 9, 2017, and the effect of those provisions on your rights in ongoing legal proceedings, including the lawsuit currently pending in the United States District Court in Phoenix, Arizona, titled Van Dusen v. Swift Transportation Company Inc. We are sending this message to clarify that the new ICOA will not interfere with your rights to participate or recover monetary relief in ongoing court proceedings in existence on January 9, 2017. Specifically, two sections, Paragraph 16 (“Reclassification”) and Paragraph 17(E) (“Indemnification” in relation to unsuccessful proceedings alleging employee status of “Contractor’s workers”), will not apply with respect to any relief granted to the parties in the Van Dusen lawsuit. This is true regardless of whether or not you have already signed the new ICOA. Paragraphs 16 and 17(E) do not waive or limit any rights or remedies you may have under any state or federal wage payment laws and statutes, including the Fair Labor Standards Act. The 
indemnification provision in Paragraph 17(E) will not require you to pay the Company’s 
attorneys’ fees or expenses for any claims you bring or which are brought on your behalf in the Van Dusen lawsuit.

Swift will not retaliate against any Contractor who chooses to participate in any ongoing court proceedings.

If you have any questions about these points or any others, you can consult with an attorney. The attorneys for the Plaintiffs in the Van Dusen case are: DAN GETMAN, GETMAN, SWEENEY & DUNN, PLLC., (845) 255-9370.

THIS MESSAGE HAS BEEN APPROVED BY THE COURT IN VAN DUSEN.

THE COURT HAS NOT YET RULED AND TAKES NO POSITION ON THE MERITS OF PLAINTIFFS’ CLAIMS FOR RELIEF.

Court Sets Argument on Temporary Restraining Order and Stay – Posted February 6, 2017

US District Court Judge Sedwick has set expedited argument on Plaintiffs’ motion for a Temporary Restraining Order and Swift’s motion for a stay of the case pending appeal for Wednesday, February 15, 2017 at 10:00 am in Phoenix. We will post further updates as information becomes available.

Plaintiffs Move to Enjoin New 2017 Contract, Certify Class and Collective; Swift Moves to Stay — Posted January 31, 2017

On Friday, January 6th, the Court ruled in favor of the drivers with respect to arbitration—the case will remain in federal court. Swift is appealing that decision, and we will fight their appeal. Swift has also asked the court to stay all proceedings pending appeal. The court has asked Plaintiffs to respond no later than February 10, 2017.

On January 9th, Swift rolled out a new contract to their currently-running Lease Operators. Swift has said that the contract must be signed by March 1st, 2017, and is retroactive to January 1st, 2017.

The release of the new contract has been accompanied by an initial message to drivers through Qualcomm, with a repeated follow-up message. Many drivers are also being pressured by their Driver Managers/Driver Leaders to sign, and it appears that the DMs/DLs are similarly being pressured to push their LOs to sign.

Plaintiffs filed an application for a Temporary Restraining Order and Preliminary Injunction with the court on Monday, January 30th, and we received a response from the court the following day, January 31st, with a schedule to address our concerns. Defendants must respond by February 7th, and Drivers will reply to their response on the 10th. The court expects to hear argument on the motion during the week of February 13, 2017.

We believe the contract is unlawful, deceptive, and coercive, and we are asking that the Court grant a temporary restraining order and preliminary injunction:(1) enjoining ¶16 and ¶17E of the new Agreement; (2) requiring Defendants to inform all lease operators including those who have already signed the Agreement that paragraphs 16 and 17E have been enjoined and are no longer operative; (3) enjoining Defendants and their counsel from engaging in any further contacts with current opt-ins and putative class members regarding the matters raised in this suit, including communications that request or require LOs to enter into agreements that may in any way impact the liability or damages issues that are currently pending before this court, without first informing Plaintiffs’ counsel and obtaining permission from the Court.

In addition, Plaintiffs have moved to renew their Collective Action Motion, which is fully briefed by both sides, and have moved for Class Certification of a nationwide class of Lease Operators.

We will post new updates as information becomes available.

Court Rules That Drivers are Employees! – Posted January 11, 2017

On January 6th, 2017, after a six-year battle which included multiple appeals to the 9th Circuit and even reached up to the Supreme Court, Judge Sedwick of the Arizona District Court ruled that the five named-plaintiff drivers are employees, not independent contractors as a matter of law, for the purposes of § 1 of the Federal Arbitration Act. You can read the full, 33-page decision here. The most important result of this decision is that the case cannot go to arbitration, as Swift argued it should, and will instead remain in the federal court where it was initially filed.

The court found that the IEL leases, “[w]hen read in conjunction with the at-will termination provision in the contractor Agreements, [meant that] Swift effectively had full control of the terms of the relationship.”

While Swift argued that the leases should not be considered for the decision, the court found that they should, noting that the lease and contract were always presented together and that “[t]he terms of the two agreements are explicitly entwined and clearly designed to operate in conjunction for those drivers who leased equipment from IEL for purposes of becoming contract drivers with Swift.”

The court found that “[t]he Plaintiffs, in fact, were not independent businesses when they started contract driving and never operated as independent business.”

Swift will likely try to appeal this decision, but we believe the court’s ruling is correct and well-reasoned.

This is an extremely significant result, and an important step in the ongoing fight, but it is not the end—there has been no judgment whether OOs/LOs are entitled to the back wages and other relief we believe they are owed. There are many issues still to be decided by the Court, including which drivers are allowed to participate (beyond the people who have already opted-in to the case); how far back claims may go; what notices should be issued; what discovery is still needed for the parties to resolve the case; and when any remaining issues can be tried.

The next step will involve a Motion for Collective Action, with a request for notice of the lawsuit to go out to all the drivers who worked for Swift as Lease Operators within the Statute of Limitations.

All drivers who leased a truck from IEL and contracted with Swift as a Lease Operator at any time since April 16, 2010 may be eligible to join this case by completing and signing a consent to sue form, available at Swift Justice by clicking “Join the Case.”.

The best source for current case updates is the website. We will continue to post new information as it becomes available.

The Wall Street Journal published an article on this decision on 1/12/2017: “Federal Judge Deals Swift Transportation Legal Setback — Ruling finds trucking company improperly treated some of its drivers as contractors rather than employees”

Court Rules Drivers are Employees! — Posted January 7, 2017

U.S. District Judge Sedwick issued a decision today that the five Plaintiffs who brought this case are employees as a matter of law, for purposes of the Federal Arbitration Act. The decision means that the case will remain in federal court and will not go to arbitration as Swift had demanded. Click here for decision. This is an extremely significant decision. We will post additional analysis of the decision in the next few days!

Depositions and Upcoming Motion for Summary Judgment — Posted May 11, 2016

The Ninth Circuit ruled that the Court must decide whether this case is arbitrable under the Federal Arbitration Act (“FAA”) or not before sending the case to arbitration. Over the past several weeks, Plaintiffs deposed Swift and IEL, and Swift deposed the five Named Plaintiff drivers. All of these depositions went very well, all resulting in good testimony on the record. Significant documentary discovery was exchanged as well.

The parties are now ready to brief whether or not Lease Operators are employees or contractors for purposes of deciding whether the Federal Arbitration Act applies to the drivers or not so that the District Court can decide. Section 1 of the FAA exempts from arbitration “contracts of employment of . . . any other class of workers engaged in foreign or interstate commerce.” Swift claims that the drivers are not employees and the drivers claim that they are employees as a matter of law, and thus, under the Section 1 exemption, that the Court must decide this case rather than an arbitrator.

We will file our Motion for Summary Judgment on the Federal Arbitration Act Section 1 Exemption in mid-June, and defendants will have a month to respond to our motion. After that, drivers will have a month to reply to defendants’ response. After all of the briefing is complete (by September 16, 2016), the Court will rule on the misclassification issue. The timeline for a decision is uncertain. We will post more information as it is available.

November 16th Oral Argument: Video Feed — Posted November 19, 2015

On Monday, November 16th, 2015, the 9th Circuit Court of Appeals heard oral arguments on the defendant’s interlocutory appeal and petition for a writ of mandamus appealing the district court’s scheduling order. The court’s video feed of the argument is available here.

Motions to Compel, Motions for Sanctions, and Appeals — Posted October 27, 2015

On July 15th, 2015, Judge Sedwick granted the Drivers’ motion to compel discovery responses (see update dated August 18, 2015), ordering Swift to produce the requested documents, yet Swift has refused to comply with those requests. In response to Swift’s unwillingness to cooperate in the discovery process, Drivers filed a Motion for Sanctions (Dkt 684) on September 22, 2015, including a request that the Court finds Swift in contempt of Court and to fine Swift each day until they comply with all outstanding discovery. Swift responded on October 9, 2015 (Dkt 689), and Drivers replied on October 22 (Dkt 695).

Despite numerous decisions to the contrary from Judge Sedwick, Swift continues to argue that the question of whether this case should go to arbitration (and, by extension, whether Drivers are Independent Contractors or Employees) hinges only on the evidence from the “Contractor Agreements,” and not from any other source of information (Dkt 15-15257 16-1). The Drivers believe that other factors illustrate the relationship between Swift and the Drivers (Dkt 15-15257 21-1). The case law supports Drivers’ view. Even though Swift’s position is wrong, Swift asked both the Arizona Court and the 9th Circuit Court for a stay of the case while they appeal Judge Sedwick’s most recent scheduling and discovery decision. The Drivers opposed the stay, and ultimately both courts denied the stay requests, again agreeing with the Drivers. Swift is now attempting to extract the stay they were denied by refusing to cooperate with the discovery process, requiring the Motion for Sanctions. Swift filed two appeals with the 9th Circuit—an interlocutory appeal and a Petition for Mandamus, both essentially arguing the same issue—that the discovery and scheduling order that Judge Sedwick issued amounts to a trial on the merits of the case, and prejudices the defendants. Drivers disagree, maintaining that this information is necessary for the Judge to be able to rule correctly on the question.

The case in the district court will continue on the same schedule the judge set, and at the same time, both parties will argue the appeals. Oral Arguments for both the interlocutory appeal and the Petition for a Writ of Mandamus have been scheduled for Monday, November 16, 2015 – 9:00 A.M.

In the meantime, we await Judge Sedwick’s decision on the Drivers’ most recent motion for sanctions. We will post more information as it becomes available.

To Protect Claims in This Case, Plaintiffs Have Objected to Settlement in Montalvo v. Swift and Calix v. Central Refrigerated – Posted October 2, 2015

In Montalvo v. Swift Transportation Co. of AZ, LLC, and Calix v. Central Refrigerated Service, Inc., the plaintiffs claimed that Swift and Central violated various California state laws for failing to pay drivers minimum wage for the time spent at Swift’s and Central’s new hire orientation in California from July 12, 2007 to July 10, 2015. A tentative settlement was reached between the parties which called for each owner operator to receive between $14.18 and $83.21 in settlement of these claims. Because the release language in the settlement could be taken to mean that Owner Operators give up claims which are being raised in this case, such as Swift’s and Central’s failure to pay Owner Operators minimum wage during the time they hauled freight for Defendants, Getman Sweeney is extremely concerned that the Montalvo/Calix settlement is not in any Owner-Operator’s interest. Plaintiffs’ lawyers in this case reached out to Defendants’ attorneys, to see if our concerns could be addressed in such a way that drivers could participate in the Montalvo/Calix settlement and avoid giving up claims that are asserted in this case. To date, Defendants’ attorneys have refused to cooperate. Accordingly, Plaintiffs’ lawyers in this case were required to submit an Objection to the proposed Montalvo/Calix class settlement. Getman Sweeney advises its clients to DO NOTHING at the present time with respect to opting out of the Montalvo/Calix settlement, as Getman Sweeney has asked the court to either 1) declare that individuals covered by our cases are not releasing any claims if the Montalvo/Calix settlement is approved, or 2) not approve the settlement, or 3) if the settlement is approved as is, that the court exclude our clients from such a settlement, or 4) be given additional time to exclude themselves following clarification of the scope of the release. We will be in touch with affected clients individually following additional discussion with the lawyers for the parties in the Montalvo case and/or after the final settlement fairness hearing with the court on October 30, 2015. If you are an affected class member and have not heard from us individually by early November, please contact the office for further advice concerning the Montalvo/Calix settlement.

Recent Filings and Decisions – Posted August 18, 2015

In response to Swift’s continuing refusal to participate in the discovery process, Plaintiffs filed a Motion to Compel Discovery Responses (Docket # 631) from the Defendant on April 1st. Plaintiffs also filed a Motion to Compel defendants to testify [in depositions] (Docket #644) on July 13th.

On July 15th, the Court ruled in favor of the Plaintiffs, ordering the Defendant to respond  to Plaintiffs’ discovery requests (Docket #645). The Order reads, in part,

. . . Defendants assert that the issue of whether Plaintiffs entered into contracts of employment for purposes of arbitration exemption is distinct from the issue of whether Plaintiffs functioned as employees. The court rejected that argument at docket 546 and then again at docket 605 after a detailed analysis of other Section 1 cases and applicable case law regarding employment classification. . . . For the same reasons set forth in detail at docket 605, the court rejects Defendants’ arguments once again. [The Ninth Circuit Court of Appeals] requires the [Arizona District] court to look at the economic realities of the parties’ working relationship and not just the contract at issue or the parties’ subjective intent.

Swift then filed Motions to Compel Discovery of Plaintiffs (646 and 649) on July 22nd, and filed Motions for a Protective Order (652 and 654) on July 20th.

Plaintiffs filed their Oppositions to both sets of motions (665 and 671) on August 3rd and August 6th. Swift replied to Plaintiffs’ response to their motions to compel discovery (674) on August 14th.

Plaintiffs also replied to Defendants’ opposition to compel testimony (672) on August 11th. We are awaiting decisions by the District Court on all pending discovery motions.

Meanwhile, Swift’s mandamus petition and appeal of the District Court’s decision to hold a trial of employment status are pending before the Ninth Circuit Court of Appeals. Click here to read Plaintiffs’ Response Brief.

Swift’s Delays – Posted June 24, 2015

The law of truck driver misclassification as independent contractors continues to develop, with many courts finding drivers misclassified. Two important decisions were rendered by the Ninth Circuit court of appeals with respect to FedEx drivers. Another important decision was rendered by the trial judge in this case, U.S. District Judge Sedwick in Collinge.v.Intelliquick finding drivers very similar to Swift drivers to be employees as a matter of law. This case was also handled by Martin & Bonnett, co-counsel for the drivers in this case.

As this case moves toward its inevitable conclusion, Swift continues to make numerous efforts to delay the day of decision. After Swift filed its Petition for Mandamus asking the Ninth Circuit to find that Judge Sedwick acted in “clear” error by stating he will consider evidence beyond the contract to determine if the drivers are employees, the Ninth Circuit asked Plaintiffs to file an Opposition to Swift’s Petition For Mandamus which was filed on June 10, 2014. In addition to filing its petition for mandamus, Swift also filed a notice of appeal from the same decision. Plaintiffs moved to dismiss that appeal, but that motion was denied by the Circuit. We continue to believe that the appeal is entirely improper since appeals are only available from a final order (deciding a claim) or if a statute confers the right to an interlocutory appeal and the Court of Appeals stated this issue would be considered in our opposition brief. In that brief, the drivers will argue that Judge Sedwick’s decision allowing discovery is hardly a “final order” and no statute confers the right to an appeal from this order. Swift has now filed its appeal brief with the Ninth Circuit. The drivers’ brief will be due July 22nd. Swift had also asked the Ninth Circuit and the District Court to stay proceedings while the appeal is pending. Both courts denied Swift’s motion to delay the proceedings. Nevertheless, Swift has refused to meaningfully participate in discovery in the District Court, despite the denial of a stay. So, the drivers filed a motion in the District Court to compel Swift to answer discovery. Swift filed its response. Plaintiff drivers filed a Reply Brief. The motion is still pending in the District Court.

Swift’s Increasing Desperation – Posted February 26, 2015

Even after the Court’s denial of Swift’s motion to reconsider, Swift has done everything within its power to delay the day of reckoning – a day in the near future when District Judge Sedwick will determine whether by law, Swift treats the Named Plaintiffs as employees. Swift has repeatedly asked the Court to consider whether the drivers are employees based only on the contract and lease. The Drivers, and the Court have agreed that the determination requires considering Swift’s policies and practices in addition to the contract and lease. After the District Court rejected Swift’s motion to reconsider the discovery process for this determination, Swift filed a notice of appeal. The Drivers believe that this appeal is entirely frivolous, as there is no right to appeal an interim decision of a District Court regarding how employee misclassification is to be determined. Swift also filed a motion with the District Court asking the Judge to stay proceedings in the District Court while the appeal was pending. We opposed Swift’s application for a stay and asked the Court to sanction Swift for a frivolous motion. While the Court did not sanction Swift, Judge Sedwick also did not grant Swift the stay it had sought. Click here to review the Court’s Decision. Today, Swift has filed a petition for Mandamus asking the Ninth Circuit to rule that Judge Sedwick acted in “clear” error by stating he will consider evidence beyond the contract and that no other legal avenue is available to correct this error. We continue to believe that the Ninth Circuit will unequivocally deny Swift’s efforts to take the issue (which the Ninth Circuit directed Judge Sedwick to hear) away from Judge Sedwick at this point. Since Judge Sedwick has refused Swift’s motion for a stay, Swift’s filings in the Ninth Circuit should do nothing to derail the inevitable progress of this case toward discovery and dispositive motions by December 2015, and if necessary, a trial shortly thereafter.

District Court Denies Swift’s Motion for Reconsideration – Posted January 22, 2015

In July of 2014, both sides submitted proposed schedules to the District Court for how the case should proceed to resolve the question of whether the drivers are employees as a matter of law – this being the question the Ninth Circuit directed the District Court to decide. If the drivers are employees, their claims cannot be sent to arbitration. The drivers called for discovery and a trial; Swift said the Court should make a decision based solely on the contract and lease. The Court adopted the drivers’ proposal. Shortly thereafter, Swift moved the Court to reconsider this order. On January 22nd, the Court denied Swift’s motion again deciding that a trial on the issue of whether the drivers are employees is required by the Ninth Circuit and that the trial would consider evidence of Swift’s practices outside those identified in the contract and lease themselves. During the period that the parties have been waiting for the Court’s decision, the Drivers have served discovery demands and held many meetings to discuss the scope of discovery. For the most part, Swift has refused to participate in discovery, though this may change in light of the Court’s ruling today. The Court also extended the discovery period by seven months, to give the parties time to complete discovery on the relevant issues.

Case Update – Posted October 21, 2014

The U.S. Court of Appeals for the Ninth Circuit ordered that the District Court must determine whether the Federal Arbitration Act applies to the drivers in this case before deciding whether it must send the case to arbitration. The FAA states that “nothing herein contained shall apply to contracts of employment of seamen, railroad employees, or any other class of workers engaged in foreign or interstate commerce.” Thus, according to the Ninth Circuit, the Court must determine whether the drivers are “employees” before deciding whether it must send the case to arbitration. U.S. District Judge Sedwick asked the parties to submit a joint proposal for the schedule of this case to determine whether the drivers are employees. The drivers asked for limited discovery on this issue, while Swift argued that the determination should only be made by considering the “Independent Contractor Operating Agreement.” Judge Sedwick ruled that the drivers were right. Despite this ruling, Swift has now asked the District Court to stay its motion or reconsider the scope of discovery and trial. The drivers’ attorneys have opposed this motion and filed an opposing brief arguing that the issue was already decided and that Swift failed to meet the requirements for a motion to reconsider. The parties expect Judge Sedwick to rule shortly on the issue of the scope of discovery and trial.

We expect Judge Sedwick to reaffirm his prior ruling that he will hear the evidence to determine if drivers were misclassified and are in fact employees and not make the decision solely on the basis of the contract. We have worked hard for the past four and a half years to get the Court to rule on this basic legal issue of our case, including two trips to the Ninth Circuit Court of Appeals and defending against Swift’s petition to reverse the Circuit in the U.S. Supreme Court. The issue of whether drivers were treated by Swift as employees is now moving closer to resolution. While this issue is pending, the drivers have served discovery demands on Swift for documents and data related to the employment/contractor misclassification question and are awaiting Swift’s response.

Scheduling Order Set By District Court – Posted October 7, 2014

The Ninth Circuit Court of Appeals directed the District Court to decide whether owner operators are employees or independent contractors prior to sending the case to arbitration. If the drivers are employees, the case cannot be sent to arbitration. The Court has now set a schedule for determining a critical issue in this case. The parties filed competing proposals for how the issue should be decided. Plaintiffs asked the Court to hold a trial on the issue, while Swift asked the Court to limit its consideration on the issue to the agreement it drafted and imposed. The Court adopted Plaintiffs’ proposal. The parties now have a short period of time to conduct discovery prior to a trial by the District Court on this critical issue. Plaintiffs also made a motion to add two additional named representatives. So far Swift opposes this motion. Additionally, Swift has now made a motion to ask the District Court to reverse its prior decision as to the scope of discovery and trial. Plaintiffs’ counsel will oppose this motion shortly.

Protecting Claims Here From Ellis v. Swift – Posted October 7, 2014

The Plaintiffs’ lawyers in this case were required to take steps to protect these claims from interference by a proposed class action settlement in the Ellis v Swift Transportation case. Ellis is a case challenging Swift’s failure to give notice of consumer background information. While the case
has nothing to do with this case, the proposed release language could have been viewed as prohibiting the forced labor and unconscionability claims involving Swift and Central’s misuse of the DAC Report. To protect the class, Getman Sweeney and Martin Bonnett have been trying to obtain an agreement from Swift’s attorneys to the effect that claims in this case would not be barred by that settlement, if approved by the District Court for the Eastern District of Virginia. Swift initially refused to sign a stipulation. The lawyers here were required to find counsel in Virginia and file a motion and
Objection to the proposed Ellis class settlement. Once the objection was filed, the Court called all the lawyers together and an acceptable stipulation was filed. The stipulation was so ordered by the Court. Click here to review the stipulation and Order. The claims in this case are now protected.

QUESTIONS ABOUT THE ELLIS V SWIFT SETTLEMENT RAISED – July 30, 2014

In Ellis v. Swift Transportation Co. of AZ, the plaintiffs claimed that Swift violated the federal Fair Credit Reporting Act by performing credit checks without advising applicants of certain things required by the law. A tentative settlement was reached between the parties which called for each owner operator to receive $50 in settlement of these claims. The settlement notice that was mailed did not advise owner operators of the full scope of claims that might be “released” by accepting the $50 or by failing to exclude themselves from the settlement. Because the release language in the settlement could be taken to mean that Owner Ops give up claims which are being raised in this case: such as whether Swift engaged in Forced Labor by using the DAC Report to force drivers to continue to work for Swift, Getman Sweeney is extremely concerned that settlement is not in any Owner-Operator’s interest. Plaintiffs’ lawyers in this case are reaching out to the Plaintiffs’ attorneys in Ellis v. Swift, to see if our concerns can be addressed in such a way that the drivers can participate in that settlement and avoid giving up claims that are asserted in this case. Until further notice, however, Getman Sweeney advises its clients to DO NOTHING with respect to making a claim in the Ellis case. We will be in touch with clients individually following our discussion with the lawyers for the drivers in the Ellis case. If you have not heard from us individually by mid-September, please contact the office for further advice concerning how to handle claims in the Ellis case.

Supreme Court Denies Swift’s Motion to Hear Case – June 16, 2014

The Supreme Court today denied Swift Transportation’s motion to hear Swift’s argument as to why the 9th Circuit Court of Appeals was wrong. This is a significant victory for the Drivers in this case. The Supreme Court’s ruling, leaves standing a ruling by the Ninth Circuit which was favorable to the drivers, holding that the District Court cannot send the case to arbitration to determine whether the Federal Arbitration Act applies. While the issue is fairly technical, it is an important one for truckers. Most importantly, it means that there will not be another year or more of delay before the case moves forward.

Swift Files Petition for Certiorari in the Supreme Court – February 4, 2014

Swift has filed a “petition for certiorari” with the Supreme Court asking the high court to hear Swift’s challenge to the Ninth Circuit’s decision that the District Court must decide whether the Federal Arbitration Act applies to this case before sending the case to arbitration. The Ninth Circuit’s ruling was a critical decision in favor of the drivers, since it meant that the District Court must decide whether the ICOA/Lease constitute a contract of employment, and if the Court found the contract to be one of “employment” then the case would never go to arbitration. In fact, in a similar case against Central Refrigerated, the Court found the ICOA/Lease to be a contract of employment that could not be sent to arbitration under the Federal Arbitration Act. Swift wants the drivers to have to ask that question individually in arbitration – where it knows that few, if any, drivers will be able to afford litigating the case individually. The Ninth Circuit had agreed to stay its decision, giving Swift 90 days in which to make another stay motion to the Supreme Court, which it has not done. If the Supreme Court does not stay the case while it considers whether or not to take the case, the current stay will expire. Click here to read Swift’s petition for certiorari. The Supreme Court gets approximately 7,000 requests to hear cases each year, but hears only one to two percent.

Swift Vows to Take Case to Supreme Court – December 10, 2013

Swift asked the Ninth Circuit to stay its decision requiring the District Judge to determine if the drivers are employees or contractors. Swift claims it will be filing a “petition for certiorari” with the Supreme Court asking it to reverse the Ninth Circuit. The Ninth Circuit agreed to stay its decision – but only for 90 days, giving Swift time to make another stay motion to the Supreme Court. If the Supreme Court does not stay the case while it considers whether or not to take the case, the current stay will expire and the case will proceed. This stay application is not surprising, since Swift has shown it will do anything it can to avoid or delay having the Court hear the drivers case. We will know soon whether the Supreme Court will decide to stay the decision while it decides whether to hear the case.

Major Preliminary Victory! – November 12, 2013

On November 6, the 9th Circuit Court of Appeals ruled that the District Court erred by sending the case to arbitration. Because the Federal Arbitration Act (under which the Court sent the case to arbitration), does not apply to “contracts of employment” of workers in interstate transportation (such as truck drivers), the Circuit Court held that the District Court cannot send our case to arbitration until it has determined whether the drivers are employees. If the District Court determines that drivers are employees, the case cannot be sent to arbitration and will remain in federal court. Click here to read the Court of Appeals’ ruling. The process for deciding whether the drivers are employees has not been settled by the Court.

The Ninth Circuit Decides Oral Argument Not Needed

The Ninth Circuit has now decided that it does not need oral argument to decide the issue the Drivers presented on appeal, whether the District Court must decide whether Drivers are employees or contractors before it can send the class action filed against Swift to arbitration. If the Court finds the Drivers to be employees, it could not send the case to arbitration at all. The Drivers consider it a hopeful sign that the Circuit decided not to hear argument, as the Ninth Circuit previously decided that the drivers’ claims cannot be sent to arbitration without the District Court first deciding whether they are employees or contractors, when the Drivers filed a “mandamus petition” in that Court. While the lawyers believe the Court’s decision is a good sign, we cannot be sure when the Circuit will make a decision on the case. It has taken over a year for the Circuit to set a date for argument. While the appeal moves slowly, we have every reason to be optimistic about a favorable outcome.

Oral Argument Scheduled

On Wednesday, August 28, 2013, the Ninth Circuit notified us that we are on the Court’s schedule for oral argument on November 4, 2013. The oral argument will take place at 9:00 a.m. at the U.S. Court of Appeals for the Ninth Circuit, James R. Browning U.S. Courthouse, 95 Seventh Street, Courtroom 4, San Francisco, CA 94103. Oral argument is open to the public. An audio recording of the argument will be available to the public the day after the argument at http://www.ca9.uscourts.gov/media/

Swift Transportation Acquires Central Refrigerated

On August 6, 2013, Swift Transportation Company acquired Central Refrigerated Transportation, Inc. in a transaction valued at $225 million. We do not anticipate that the acquisition will affect either our litigation against Swift Transportation or our litigation against Central Refrigerated. We will update our website if the acquisition affects our litigation in any way.

The parties continue to wait for the Ninth Circuit Court of Appeals to determine whether District Judge Sedwick erred by sending this case to arbitration without deciding first whether the Plaintiffs are exempt from the Federal Arbitration Act. The appeal was fully briefed 15 months ago on May 1st, 2012. While the Ninth Circuit may take as long as it wishes, either to schedule oral argument or to decide the appeal without argument, we believe there is a good chance we will be scheduled for oral argument during the Court’s November calendar. Getman Sweeney is hopeful that the Court will affirm our position and reverse the District Court, since the Ninth Circuit already ruled that Plaintiffs were correct on this precise question in its prior ruling on the mandamus petition.

352 Drivers Join Lawsuit Against Swift – August 8, 2013

As of this date, 352 drivers have joined the lawsuit against Swift Transportation. If you would like to join, please navigate to Swift Justice and click “Join the Case.”

Waiting On the Ninth Circuit Court of Appeals – Posted on January 4, 2013

The case cannot move forward until the Ninth Circuit Court of Appeals determines whether District Judge Sedwick erred by sending this case to arbitration without deciding first whether the Plaintiffs are exempt from the Federal Arbitration Act. The appeal was fully briefed seven months ago on May 1st, 2012. The Ninth Circuit may take as long as it wishes, either to schedule argument or to decide the appeal without argument. Until then, we wait. Click here to read Plaintiffs’ opening Appeal Brief. Click here to read Defendants’ Response Brief. Click here to read Plaintiffs’ Reply brief. Getman Sweeney is hopeful that the Court will affirm our position and reverse the District Court, since the Circuit already ruled that Plaintiffs were correct on this precise question in its prior ruling on the mandamus petition. We now await the decision of the Ninth Circuit. The Court has not set a date for oral argument.

Appeal Briefing Completed – Posted on May 16, 2012

All briefing has been completed in the Ninth Circuit Court of Appeals on the question of whether the District Court erred by sending this case to arbitration without deciding first whether the Plaintiffs are exempt from the Federal Arbitration Act. Click here to read Plaintiffs’ opening Appeal Brief.Click here to read Defendants” Response.Click here to read Plaintiffs’ Reply Brief. We are hopeful that the Court will affirm our position and reverse the District Court, since the Circuit already ruled that Plaintiffs were correct on this precise question in its prior ruling on the mandamus petition. We now await the decision of the Ninth Circuit. The Court has not set a date for oral argument.

Video Update About Status Of The Case – Posted on January 25, 2012

Getman Sweeney has prepared a short video about the status of this case, particularly addressing the pending appeal of Judge Sedwick’s decision to send this case to arbitration.

Plaintiffs Granted the Right to Appeal – Posted on January 20, 2012

The 9th Circuit Court of Appeals has agreed to to permit an appeal of Judge Sedwick’s decision to send the case to arbitration. Plaintiffs are very happy that the Court has agreed to hear our appeal, as an earlier panel of the 9th Circuit has already ruled that the decision to send this case to arbitration to decide if the drivers were legally deemed independent contractors was in error. If the 9th Circuit reverses Judge Sedwick’s order sending the case to arbitration, a hearing will be held in the District Court to decide if the trucker plaintiffs in this case were treated as employees by Swift. Plaintiffs expect to argue that if Swift mis-treated the drivers as employees (while calling them independent contractors) drivers would be entitled to back pay for deductions, such as lease, insurance, tolls, gas, bonds, etc. and also be entitled to minimum wage for each week of work, as well as a variety of other damages.

Posted on October 19 2011

Plaintiffs have asked the 9th Circuit to permit an appeal of Judge Sedwick’s decision to send the case to arbitration. (Sending the case to arbitration would likely result in denial of class certification and would be prohibitively expensive to bring on an individual basis). The matter is fully briefed and we are awaiting the decision of the Court.

Posted on Friday, September 9 2011 at 2:33pm

Recognizing that the 9th Circuit’s opinion suggests that a District Judge and not an arbitrator must determine if the drivers in this case are employees, but disagreeing with that finding, Judge Sedwick has certified an appeal to the 9th Circuit on the question of whether the case can be sent to an arbitrator. Click here to review the District Court’s certification order. (321 ORDER that plaintiff’s motion at [315] is GRANTED i.pdf 38KB) Now the 9th Circuit must decide whether to hear the appeal. Because the case is not concluded, appeals are discretionary and must be approved by both the District Court and the Appeals Court. We expect that the 9th Circuit will agree to take the appeal.

Posted on Wednesday, July 27 2011 at 2:43pm

The Ninth Circuit Court of Appeals issued a ruling today holding that a Court must determine whether the Federal Arbitration Act’s exemption for employees in interstate commerce applies to truck drivers such as the Plaintiffs in this case. Nevertheless, the Ninth Circuit refused to grant the mandamus petition and order the District Court to reverse the prior decision sending the case to arbitration. Thus, the Ninth Circuit affirmed the Plaintiffs’ legal position that the law requires a Court to decide whether the owner operators are “employees” exempt from the Federal Arbitration Act, but did not order the District Court to comply with that ruling. Click here to review the 9th Circuit’s decision. (15 Opinion Denying Mandamus.pdf 73KB) It may take a short period for the parties and the District Court to work out the effect of the decision, however, Plaintiffs are optimistic however, given that the Ninth Circuit affirmed our legal position. Further updates will be posted as the effect of this ruling and how it affects the parties’ positions becomes clear.

Posted on Wednesday, July 27 2011 at 2:35pm

On July 25th, Plaintiffs filed a reply brief in support of their motion to lift the stay for arbitration. Click here to review Plaintiffs’ Reply Brief. (300 P. Reply to Response to Motion re [277] Motion.pdf 101KB) Defendants filed a motion requesting the opportunity to file a “sur-reply” and that motion was granted by the Court. After those papers are filed with the Court, the matter will await decision by the District Court.

last edited on Wednesday, July 27 2011 at 2:46pm

Posted on Thursday, June 30 2011 at 4:01pm

Defendants have filed their opposition to the Plaintiffs’ motion to vacate the stay for arbitration. Click here to review the defendant’s papers. (287 D Opp to Pl. Motion to Vacate Stay.pdf 1MB) Plaintiffs will file a reply brief shortly.

Posted on Tuesday, June 14 2011 at 2:45pm

Plaintiffs have filed a motion with the District Court to have the case returned to the District Court in light of the high expenses that would be required for individuals to arbitrate their claims. Over the last few months, numerous Plaintiffs have filed arbitration demands, seeking to have the American Arbitration Association declare that the arbitrations can proceed under a financial hardship waiver. Swift and IEL have refused to pay the AAA’s fees necessary to permit the arbitrations to go forward and under the AAA’s arbitration practices, these individual arbitrations can only occur once the Plaintiff pays substantial filing fees, or agrees to incur additional indebtedness to later pay such filing fees. Click here to read the brief filed with the Court. (277 Motion to Lift Stay, Motion to Vacate.pdf 317KB)

Posted on Tuesday, May 10 2011 at 4:20pm

Oral argument was held by the 9th Circuit on the Plaintiffs’ Mandamus Petition. Edward Tuddenham argued the motion for Plaintiffs. Paste this link into your browser to listen to the argument:
http://www.ca9.uscourts.gov/media/view_subpage.php?pk_id=0000007482

The question of whether the District Court had the authority under the FAA to send this case to arbitration is now before the 9th Circuit for decision.

Posted on Thursday, April 21 2011 at 11:53am

Plaintiffs have filed 57 separate arbitration demands with the American Arbitration Association for the issues presented in this case. The cases are in a legal limbo as the AAA recognizes that the arbitration clause drafted by Swift and IEL requires an arbitrator to determine whether the claimants are exempt from having to pay the filing fees. However the AAA will not administer the cases without the prepayment of filing fees. Plaintiffs continue to try to work this process out with the AAA.

Posted on Thursday, April 21 2011 at 11:50am

The Court of Appeals for the Ninth Circuit has set oral argument on the Plaintiffs’ mandamus petition for Monday May 9, 2011 at 9 am. The argument will be handled by Edward Tuddenham for the Plaintiffs. The mandamus petition seeks the intervention by the 9th Circuit to direct District Judge Sedwick to hear the question of whether Plaintiffs are actually employees (under Section 1 of the Federal Arbitration Act) before sending the case to Arbitration.

last edited on Thursday, April 21 2011 at 11:55am

Posted on Wednesday, March 9 2011 at 12:31pm

On February 23, 2011, Swift and IEL filed papers opposing Plaintiffs’ motion to the 9th Circuit Court of Appeals, in which Plaintiffs requested the Court to direct the District Court to consider whether the case is exempt from arbitration under Section 1 of the Federal Arbitration Act (FAA). Click here to review Swift’s opposition brief. (7-1 D Response to Writ of Mandamus of Real Parties In Interest.pdf 1MB) The Section 1 exemption to the FAA exempts “contracts of employment of … any other class of workers engaged in foreign or interstate commerce.” The question to be decided by the Court of Appeals is who must decide whether the ICOA is really a contract of employment, the District Court or the arbitrator.

Posted on Wednesday, February 9 2011 at 9:34am

The Ninth Circuit yesterday gave Plaintiffs good news when it ruled that the “petition for a writ of mandamus raises issues that warrant a response. (4 Order re Response to Mandamus.pdf 28KB)” A writ of mandamus is an “extraordinary remedy” and one that the Court does not generally grant. However, the Court’s ruling now indicates that the Court will seriously consider whether the District Judge erred in sending this case to arbitration. Under the terms of the Order, Swift and IEL, as well as the District Judge, are given 14 days to respond after which Plaintiffs will have 5 days to reply.

last edited on Wednesday, February 9 2011 at 9:36am

Posted on Friday, December 10 2010 at 12:49pm

After Judge Sedwick denied Plaintiffs’ request to reconsider his decision referring this case to an arbitrator, and after his denial of Plaintiff’s request that he certify the issue to the 9th Circuit Court of Appeals, Plaintiffs continue to believe that the District Court erred by referring to the arbitrator the question of whether the case is exempt from arbitration under Section 1 of the Federal Arbitration Act. Plaintiffs continue to believe that the issue was wrongly decided, contrary to every decision to have considered the issue, and thus are today presenting the issue to the 9th Circuit Court of Appeals on a petition for mandamus. Click here to read a copy of the petition for mandamus. (final mandamus petition _2_.pdf 128KB) A Writ of Mandamus is an extraordinary writ that seeks to have a Court of Appeals correct error by a district court, even though no appeal is presently available. Although such writs are sparingly granted, Plaintiffs believe there are strong grounds for the 9th Circuit to hear the issue at this time.

last edited on Friday, December 10 2010 at 12:53pm

Posted on Monday, December 6 2010 at 9:29am

Judge Sedwick denied Plaintiffs’ motion for reconsideration (229 ORDER FROM CHAMBERS denying Plaintiffs’ Motion for Reconsideration.pdf 13KB). After this order, Judge Sedwick denied Plaintiffs’ request that he certify the issue to the 9th Circuit Court of Appeals. Plaintiffs continue to believe that the District Court erred by referring to the arbitrator the question of whether the case is exempt from arbitration under Section 1 of the Federal Arbitration Act. Plaintiffs continue to believe that the issue was wrongly decided, contrary to every decision to have considered the issue, and are weighing and preparing their next actions in response.

last edited on Monday, December 6 2010 at 9:39am

Posted on Wednesday, October 20 2010 at 5:32pm

Many owner operator drivers who have turned in their trucks, or who have had their trucks repossessed, have received debt collection notice letters from IEL or collection agencies working on its behalf (for example Partners Financial or ACRS). The letters claim that these drivers owe money.

Many drivers do not know why they owe money or they dispute the debt claim. In this case, Swift and IEL claim that they do not attempt to collect the full amount of unpaid lease payments. See the post above dated Monday, August 2, 2010 for fuller information. If you are being billed for the full amount of remaining lease payments, download and attach the declaration of Ms. Parrish in that post which states that IEL does not actually collect full remaining lease payments.

If you receive a letter informing you that you owe a debt, and you dispute this debt, you should know that under the Fair Debt Collection Practices Act, you may send the bill collector a letter that you dispute the debt. If you are already a plaintiff in this case, you may call us if you wish us to send the letter on your behalf. If you dispute the debt, the debt collector must cease collection efforts until the debt is verified. Click here to download a sample letter form to a debt collector, Swift or IEL. (billing dispute form.pdf 6KB) If you wish to send your own letter or are not a plaintiff in this case, please make sure you send the letter by certified mail, return receipt requested. Please also send us a copy of your letter.

This letter should state that you dispute the debt claim and request verification of the claim. Click here for a sample letter to use. When you dispute the debt and request validation, by law, the debt collector must verify the debt claim and must cease debt collection activities during this time period.

last edited on Wednesday, October 20 2010 at 5:33pm

Posted on Tuesday, October 19 2010 at 6:08pm

Plaintiffs have asked Judge Sedwick to reconsider his decision to send this case to arbitration. Specifically, Plaintiffs argue that the Court may only send a case to arbitration if either the Federal Arbitration Act (FAA), or the Arizona Arbitration Act (AAA) applies. We argue that the FAA does not apply because the Plaintiffs are really employees as a matter of law, and FAA section 1 exempts interstate transportation employees such as the Plaintiffs (and the AAA does not apply to employees). The Order compelling arbitration, sent to the arbitrator the question of whether the FAA applies. However, Plaintiffs argue that the question of whether Plaintiffs are employees (and thus whether the exemptions to the FAA and AAA apply) is thus an issue the Court must address first. Click here to review the Plaintiffs’ motion for reconsideration. (226 Motion for Reconsideration re Order on Motion to Certify Class.pdf 45KB) Reconsideration is not commonly granted, but in this case, Plaintiffs believe the Court overlooked clear law. Alternatively, Plaintiffs requested that the Court grant an immediate appeal. Furthermore, in accordance with the Court’s order compelling arbitration, on October 8, 2010, Plaintiffs have filed a demand for arbitration with the AAA on behalf of all Plaintiffs, including those who have already joined the case.

Posted on Thursday, October 7 2010 at 9:38am

ROUND 1 GOES TO SWIFT

Judge Sedwick was considering three motions, Plaintiffs’ motion for permission to mail a collective action motion to all owner operators, Plaintiffs’ motion for a preliminary injunction, and Defendants’ motion to move the case to arbitration. Judge Sedwick did not rule on the Plaintiffs’ motions, but did rule that the case must go to arbitration.

In the motion, defendants Swift and IEL claimed that the arbitration clause which they inserted in the ICOA demands that the case go to arbitration before the American Arbitration Association (“AAA”). Plaintiffs objected, noting that the Lease agreement requires that claims be heard in Court. Plaintiffs pointed out that the claims arise primarily from the Lease or under both clauses, and since the clauses conflict, they must legally be considered against the party who drafted them. Plaintiffs also argued that the arbitration clause was unconscionable and the defendants had waived the argument through their litigation tactics.

Unfortunately, Judge Sedwick ruled that the Swift arbitration agreement compels all issues in this case to be heard by an arbitrator, rather than the Court. Click here to review the arbitration decision. (223 Order and Opinion Compelling Arbitration.pdf 60KB) Remarkably, Judge Sedwick entirely failed to address the primary argument advanced by the Plaintiffs, that is, that the arbitration clause in the ICOA was flatly contradicted by the clause in the Lease, strictly requiring the claims in this Case to be heard in Court. And to make matters worse, Judge Sedwick ruled in such a way that no appeal of his ruling is permitted, until after the arbitration occurs.

You should know that the conservative Supreme Court and previous conservative Congresses have, for the last two decades, increasingly made arbitration a priority for all employment and consumer cases, effectively allowing large and powerful companies the power to insulate themselves from lawsuits by cantankerous employees and consumers they have cheated. They and their teams of lawyers can simply remove the constitutional guarantee of a court or jury from those who would sue them. This secret removal of poor and middle income people’s legal rights has been accomplished far from the public limelight, as it is a technical issue that most people simply don’t understand and don’t pay attention to — that is until it happens to them. Along with this removal of the remedy of going to court, is the fact that “class action waivers” – clauses that companies write into the form agreements they have customers or employees sign which prohibit claims being brought as class actions, have frequently been held to be valid. Class actions allow employees to work together to gather evidence, and reduce costs by spreading the costs over a much larger group. The effect of these twin doctrines has been that employees and consumers are shunted into a forum favorable to the companies that support them and they are barred from taking action collectively. The net effect is that claims are far more difficult and expensive to bring, allowing the companies to avoid the normal legal consequences for their illegal behaviors. For more information on arbitration cases generally, see http://www.tlpj.org the website of a public interest law firm primarily working on arbitration issues.

This is a serious and negative ruling that makes many aspects of the case more difficult for us. As a general rule, the arbitration forum is considered more beneficial for large corporations for many reasons (indeed, that is why Swift demanded it in the ICOA). Among other things, it prevents employees from having access to much of the internal company documents that can be necessary to win their claims. Depositions of company officials may not be available, for example. But as with any procedural ruling at the start of the case, this ruling will be a two-edged sword that Plaintiffs can use as well. It is true that the ruling will create difficulties for Swift as well as the trucker Plaintiffs. There are significantly greater costs to arbitration for both the Plaintiffs and Swift. And all of these costs will ultimately be borne by Swift if the arbitrator rules for Plaintiffs.

Also, on the plus side for Plaintiffs, arbitration is a much more streamlined process and Swift is unlikely to be able to tie up the litigation for long periods of “discovery” in which they would be able to depose and question truckers for months or years before trial.

The Plaintiffs’ legal team will be carefully analyzing the ruling and our next steps this week as we prepare for the arbitration. We will post further updates shortly to let you know just how we intend to use this ruling to ultimately prevail and force Swift to comply with the law.

While we are very disappointed in this ruling, which we consider to be completely incorrect, this is a very preliminary ruling which may also turn out to help us further down the road.

Posted on Monday, August 2 2010 at 4:32pm

In order to argue against Plaintiffs’ motion for a preliminary injunction barring Swift and IEL’s collections for the full amount of the remaining lease payments following their putting a driver in “default” status, Swift has filed a remarkable affidavit, stating that Defendants will demand the full remaining lease payments in its demand from drivers, but will not, in fact, seek all remaining payments. Elizabeth Parrish has filed an affidavit stating that a “lessee [in default] is responsible only for costs incurred by IEL in preparing the truck for re-lease, and any lease payments missed prior to the re-lease or sale of the truck.” See Paragraph 9. Click here to review the Parrish affidavit. (175 Declaration of Elizabeth Parrish 172 Response to Motion.pdf 297KB) Thus Swift and IEL are admitting that they overbill drivers, but stating that they will not actually pursue such overbilled amounts. Drivers who received demands for all remaining Lease payments following a “default” should show this Parrish affidavit to any collections agency or credit reporting agency. Further, please let Getman Sweeney know if you have been overbilled by defendants, or threatened with the higher charges.

Posted on Friday, July 23 2010 at 3:14pm

Plaintiffs filed their Opposition to Defendants’ Motion to Compel Arbitration of the claims in this case. Plaintiffs argument is based on the fact that the Lease agreement demands that claims be litigated in Court, that the ICOA’s arbitration provision conflicts with the Lease and is superceded by it. Also, the Federal Arbitration Act and the Arizona Arbitration Act bar enforcement of arbitration for employees in interstate transportation. Finally, Plaintiffs claim that the arbitration clause is unconscionable for various reasons, including the provision of a shortened statute of limitation, imposition of the “Commercial Rules” instead of the “Employment Rules”, imposition of heightened costs on the Plaintiffs, and the ban on class action arbitration. While the arguments are highly technical, the issues are critical to the ability of Plaintiffs to efficiently secure full relief for all members of the various classes.  Click here to read Plaintiffs’ Opposition to the Defendants’ Motion to Compel Arbitration. (188 P Response in Oppose Motion to Compel Arbitration and Dismiss P claims.pdf 152KB)

Posted on Friday, July 23 2010 at 3:09pm

Plaintiffs have filed their reply brief in support of certification of a collective action and the mailing of notice to all potential class members in the case. Click here to review Plaintiffs’ Reply Brief. (187 p Reply in Support MOTION to Certify Class.pdf 78KB)

Posted on Tuesday, July 20 2010 at 2:33pm

Swift has filed its opposition to Plaintiffs’ motion for a Preliminary Injunction. Our motion seeks to stop Lease collections efforts against truckers until the Court determines if the Lease is lawful. We also seek to stop any negative reporting to DAC or DriverFACTS. We also seek to stop Swift from making mid-term changes disadvantageous to drivers to the ICOA contract. Click here to review Swift and IEL’s response to our motion. (172 D Response to P Motion for PI.pdf 125KB) Drivers who have information contrary to the claims raised by Swift are urged to call Getman Sweeney and speak with Janice or Kathy. On July 21st, the Court extended Plaintiffs deadline to file reply papers on the motion to August 3, 2010.

last edited on Friday, July 23 2010 at 3:17pm

Posted on Friday, July 2 2010 at 11:23am

Getman Sweeney would like to speak with former Swift Owner Operators who have documents or other evidence (such as photographs, emails, QualComm messages) concerning:

1) collections efforts by Swift after turning in their truck or having it repossessed, or
2) a negative DAC report from Swift or IEL, or
3) a negative credit report from Swift or IEL, or
4) mid-contract changes demanded by Swift or IEL under threat of having the truck repossessed or the driver put on safety hold until a signature is given.

If this happened to you and you have such proof, please contact paralegals Janice Pickering or Kathy Weiss (845)255-9370 to discuss.

Posted on Tuesday, June 29 2010 at 11:33am

Plaintiffs have renewed their motion for a preliminary injunction in this case. The motion asks the Court to rule that Plaintiffs are likely to win the case on the issue that the Lease/ICOA is “unconscionable.” Specifically, Plaintiffs claim that the ability of Swift to fire “owner operator” drivers for any reason or no reason, to then declare this firing as a “default” by the driver, to take repossession of the truck and still demand all payments that would have been due, even though the driver no longer has the truck, are so unfair as to be “unconscionable” under the law. The motion seeks to prevent Swift and IEL from 3 activities during the pendency of the case. First, Plaintiffs ask the Court to forbid Swift from taking collections measures (including negative DAC reports) on any driver deemed to be in “default.” Second, Plaintiffs ask the Court to forbid Swift from requiring drivers to agree to contract changes under threat of being put in “default.” Click here to read the brief in support of Plaintiffs’ PI motion.(FINAL PI BRIEF_AZ.pdf 207KB)

Posted on Friday, May 14 2010 at 10:00am

On May 11th, Plaintiffs made a motion to certify the Fair Labor Standards Act minimum wage claims in this case as a “collective action.” The motion seeks court approval to mail a notice of the case to all class members, advising them of their rights to join the case. Click here to read the Plaintiffs’ motion papers. (108 MOTION to Certify Class.pdf 124KB) Of course, individual truckers who leased a truck from IEL and drove for Swift are permitted to raise FLSA claims now by filing the Consent to Sue form which is posted at the top of this web page.

Defendants have already contacted the Court’s chambers to request information from the Court on how to delay all briefing on the plaintiffs’ motion while defendants get their motion to send the case to arbitration ready, which is due by May 25, 2010. Judge Sedwick’s chambers would not address that request unless defendants make it in motion form, which is expected shortly.

Posted on Monday, April 12 2010 at 4:22pm

The attorneys are interested in speaking with FORMER driver managers and other FORMER Swift and IEL management (including recruiters for IEL) to learn the details of how Swift and IEL’s operations worked from the perspective of those inside the companies. FORMER employees are encouraged to call Getman & Sweeney and ask to speak with Dan Getman or Carol Richman. ALSO, DRIVERS WHO HAVE CONTACT INFORMATION (SUCH AS NAME, TELEPHONE # OR ADDRESS) FOR FORMER MANAGEMENT EMPLOYEES OF SWIFT AND IEL ARE ENCOURAGED TO CALL JANICE PICKERING OR KATHY WEISS TO GIVE CONTACT INFORMATION.

Posted on Tuesday, April 6 2010 at 11:53am

On April 5th, Judge Berman transferred venue in the case to the U.S. District Court for the District of Arizona. Judge Berman found that most of the events involved in the suit emanate from Arizona and that therefor the suit should be transferred. The pending motion for a preliminary injunction will be refiled in Arizona. All individuals who filed consents to sue in the case remain in the case in Arizona. Although we hoped Judge Berman would keep the case, venue transfer motions are easy ones for defendants to win. Although the case is venued in Arizona, the case was assigned to a Judge from Alaska, the Honorable John W. Sedwick. A Magistrate Judge has not yet been assigned.

last edited on Wednesday, May 12 2010 at 6:11pm

Posted on Tuesday, April 6 2010 at 11:48am

On April 2nd, Plaintiffs moved for a “preliminary injunction” to stop Swift and IEL from instituting collections measures and to prevent them from furnishing negative credit reports on drivers they consider to be in default. Plaintiffs ask the Court to find that the lease and ICOA are “unconscionable” as a matter of law and that Swift misclassifies owner operators as independent contractors, instead of treating them as employees as the law requires. We argue that since the Lease and ICOA are likely to be found to violate the law, irreparable injury will occur to drivers if Swift is allowed to enforce its agreements in this way. Click here to read the brief in support of the motion. (69-2 Supplemental Memorandumn.pdf 133KB)

Posted on Wednesday, March 31 2010 at 4:21pm

Judge Berman has set a Court conference for April 5, 2010 at 9:30 a.m. in his Courtroom at the U.S. District Court in Manhattan to discuss the pending motions (transfer of venue, arbitration).

Posted on Wednesday, March 31 2010 at 4:20pm

Swift is routing certain owner operator drivers to select terminals to meet with its lawyers. No person who has joined this lawsuit by filing a consent to sue should participate in such a meeting without the presence of a lawyer from Getman Sweeney. And we believe that no driver should be forced to participate in this meeting. If a driver participates in such a meeting, he or she should request a copy of any papers that they are asked to sign. Getman Sweeney would like to speak with any participants in the meetings who would care to discuss what occurs.

Posted on Thursday, March 25 2010 at 9:43am

Plaintiffs have amended the complaint to raise claims under the federal “Forced Labor” statute, 18 U.S.C. §1589 and 1595, and to make various other claims in the case. Click here to review the Second Amended Complaint. (2nd amended stamped.pdf 946KB) Defendants have not yet answered the complaint, as their motion to transfer venue allows them to avoid this requirement for the time being.

Posted on Thursday, March 25 2010 at 9:38am

Plaintiffs have responded to Defendants’ request for permission to move to transfer the case to arbitration. Click here to review plaintiffs’ letter brief. (ltr to Berman stamped 3.24.10.pdf 2MB)

Posted on Wednesday, March 24 2010 at 4:14pm

Defendants have requested Judge Berman to give them permission to make a motion to dismiss the case in favor of arbitration. Click here to review defendants’ letter brief. (Def to J Berman re arbitration 3-19-10.pdf 143KB)

Posted on Thursday, March 11 2010 at 10:05am

On March 3, 2010, defendants filed their reply papers asking Judge Berman to transfer the case to Arizona. Click here to see Swift and IEL’s reply. (2.22 Def Letter Reply re Venue.pdf 354KB) The matter now sits with Judge Berman. We have filed discovery demands asking Swift and IEL to provide documents we believe will be primary evidence in the case. Plaintiffs have also served a subpoena on QualComm to obtain evidence of instructions (demonstrating control) that Swift or IEL sends drivers considered to be owner operators.

Posted on Thursday, March 11 2010 at 10:01am

On February 23rd, we filed an opposition to the transfer of venue. Click here to review our letter brief. (FINAL Letter Brief Opposing Transfer.pdf 70KB) Any truckers interested in seeing the 90 pages of exhibits that were attached to the Court filing should contact Getman Sweeney for a copy.

last edited on Thursday, March 11 2010 at 12:30pm

Posted on Friday, February 19 2010 at 1:08pm

Judge Berman also imposed the following case management plan directing that discovery begin in the case. Click here to review the Case Management Plan in the case. (20 CASE MANAGEMENT PLAN.pdf 46KB)

Posted on Friday, February 19 2010 at 1:06pm

A brief initial conference was held by U.S. District Judge Richard M. Berman in this case. Defendants also asked the Court to permit them to make a motion to transfer venue of the case to Arizona — that is to seek home field advantage. Click here to review Defendants’ Letter Brief requesting transfer of the case to Arizona. (Def. letter mot to dismiss.pdf 88KB) Judge Berman accepted defendants letter as the motion to transfer venue and asked plaintiffs to respond. This tactic was fully expected. Plaintiffs will serve their reply letter brief to the Court by Wednesday, February 24, 2010.

Posted on Friday, February 12 2010 at 2:09pm

Any truckers who are part of this case, or who are considering whether to join this case, are welcome to stop by Getman Sweeney to discuss the case and your individual facts. We are located immediately next to New York Thruway Exit 18, which has ample truck parking just at the toll plaza. Please let Janice Pickering know, in advance if possible, if you might be stopping by and we can pick you up at the toll plaza. Paradies Lane, where our office is located, is a spur and does not have room to turn around a trailer.

Posted on Friday, February 12 2010 at 2:05pm

The initial scheduling conference has been set by Judge Berman for February 17, 2010 at 9 am in courtroom 21B of the U.S. District Court, 500 Pearl Street, New York, New York 10007-1312. While scheduling conferences are not generally attended by clients and at times can be short and uninteresting, any truckers who are interested in this case are welcome to be present.

Posted on Thursday, February 11 2010 at 4:26pm

Plaintiffs have amended the complaint to add an additional named plaintiff and to clarify the claims brought in this case. Click here to see the First Amended Complaint. (17 frist amended cplt.pdf 869KB) Defendants have not yet “answered” the complaint.

Posted on Thursday, February 4 2010 at 5:11pm

Dan Getman, the attorney for the plaintiffs in this case will be speaking about the Swift case with Evan Lockridge on his show the Lockridge Report, Thursday, February 11, 2010, on Sirius XM Satellite Radio’s Road Dog Trucking channel 147 (the Lockridge Report airs weekdays 2 pm eastern/1 pm central).

last edited on Wednesday, February 10 2010 at 4:49pm

Posted on Thursday, December 24 2009 at 3:04pm

Answers to Common Questions:

What claims are covered in this lawsuit?

The lawsuit claims that Swift and IEL treated the truckers who leased trucks through IEL as “independent contractors” when they were really employees of Swift AS A MATTER OF LAW. As such, Swift and IEL failed to pay all the wages due, and made unlawful deductions from truckers’ pay for truck lease payments, gas, equipment, maintenance, insurance, tolls, Qualcomm, and bonding, etc. The case raises class action claims under the law of contract, and under various state laws which also protect workers from unlawful deductions (so far, the state laws of New York and California, however additional state statutes will apply to workers in other states). The case also raises claims that the ICOA and lease are unconscionable in that Swift can terminate the lease for any reason at all, then continue to demand that all lease payments (including profit to Swift) continue to be made. Other grounds for unconscionability include the imposition of liquidated damages and the mischaracterization of employees as independent contractors.

What remedies are sought?

Under the federal minimum wage law, back pay and an equal amount of liquidated damages are claimed for each violation. Under the law of contract, plaintiffs seek to declare the contracts void or voidable for unconscionability. In addition, under wage protections statutes, plaintiffs seek to compel Swift to reimburse truckers for the various deductions from their pay, including truck lease, insurance, gas, tolls, maintenance, etc. In addition, plaintiffs seek to compel reimbursement for additional employer expenses borne by truckers.

How far back can claims be made?

Generally claims can be made at least for the three years preceding the date the complaint was filed. You are entitled to file FLSA claims (using the Consent to Sue form) for the period extending back three years from the date you file the form. State statutory and contract claims have different limitation periods (six in NY, four in CA). Other states have different limitation periods. Please call if your lease ended over three years ago and you wish to join the case.

Do I have to pay to join the case?

No. The attorneys are handling this case on a contingent basis and will only be paid when we win through a settlement or final judgment. When plaintiffs win a pay case, the defendant must pay the plaintiffs’ costs and attorneys fees.

Can I wait to file my Consent To Sue Form?

You may be part of the class action if the Court later “certifies the case as a class action.’ However, certain claims under the Fair Labor Standards Act are not covered in the case until your Consent to Sue Form is returned to the plaintiffs’ attorneys and then filed with the Court. If you delay in filing the Consent to Sue Form, part or all of your claim may be barred by the “statute of limitation.”

Can SWIFT or IEL fire me or take action against me for joining the lawsuit?

The law prohibits retaliation for joining a pay lawsuit. If any employee suffered retaliation, Swift and IEL would be liable for double the injury caused by retaliation against an employee. Notify us immediately if you hear of any threats of retaliation or if you think any retaliation occurs. Retaliation is extremely rare in overtime cases, because an employer can suffer such serious penalties.

What locations are covered by this lawsuit?

Past and present truckers driving for Swift as “owner operators” anywhere in the U.S. may be included in this lawsuit.

last edited on Thursday, February 11 2010 at 10:18pm

Posted on Wednesday, December 23 2009 at 9:52am

The document which starts a lawsuit is called a “complaint.” Click here to review the complaint in this case. (ComplaintNY.pdf 76KB)

1106 LODGED Proposed Joint Motion for Preliminary Approval of Class Action Settlement 1105 MOTION for Leave


1106 1 Exhibit 1 Class Action Settlement Agreement


New Prime SCOTUS Opinion


55 Filed order case is removed from calendar


27 Appellees Answering Brief


30 Amicus brief Submitted by Public Justice


883 P. RENEWED MOTION to Conditionally Certify A FLSA Collective Action and Authorize Notice to be Issued to the Class Doc. 108


884 P. Motion for Class Certification and Motion for Leave to Amend Complaint


914 1 Exhibit A Notice


885 P. MOTION for Temporary Restraining Order and Preliminary Injunction


STC 108 MOTION to Certify Class


862 ORDER AND OPINION GRANTING SJ TO PLAINTIFFS


684 P. MOTION for Sanctions


689 DECLARATION of Robert Mussig re Docket 688D. Response to Motion


695 MOTION for Late Filing of Reply for Plaintiffs Motion for Sanctions


16 1 Opening Brief


21 1 APPELLEES’ Answering Brief1


REDACTED Montalvo v. Swift Final Objection to Settlement


631 P. MOTION to Compel Discovery Responses1


644 MOTION to Compel Defendants to Testify


645 ORDER granting in part and denying in part


646 MOTION to Compel Discovery


649 MOTION to Compel


652 D. MOTION for Protective Order


654 D. MOTION for Protective Order


665 P. RESPONSE in Opposition re 646 649 MOTIONS to Compel Discovery Responses and Request for Sanctions in the Amount of 7500


671 RESPONSE in Opposition re 652 and 654 MOTION for Protective Order


674 D. REPLY to Response to Motion 646 MOTION and 649 MOTION


672 REPLY to Response to Motion re 644 MOTION to Compel Defendants


21 1 APPELLEES’ Answering Brief


Collinge.v.Intelliquick


1 2 Writ


3 Real Parties In Interests’ Opposition to Petition For Mandamus


637 ORDER of USCA denying appellants motion for stay of district court


631 P. MOTION to Compel Discovery Responses


634 Def Opp to Pls Motion to Compel Discovery1


635 REPLY to Response to Motion re 631 MOTION to Compel Discovery Responses


622 ORDER the court does not find the motion 612 is frivolous and that sanctions are warranted


546 ORDER that the plaintiffs approach to what is required by the remand order is correct1


605 ORDER denying Ds Motion to Determine Appropriate Standard


546 ORDER that the plaintiffs approach to what is required by the remand order is correct


566 D. MOTION to Stay Ds Motion to Determine Appropriate Standard1


572 Pl. Opp Def Mot to Stay


548 ORDER SCHEDULING AND PLANNING


566 D. MOTION to Stay Ds Motion to Determine Appropriate Standard


48 Memorandum in Support re 47 MOTION for Settlement objection


57 STIPULATED ORDER re Stipulation of Settlement Agreement and Release and Claims


1 Def cert petition brief only


34 1 Order Reversing and Remanding


14 1 Opening brief2


18 Defendants Appellees Answering Brief2


22 P. Reply brief1


14 1 Opening brief


18 Defendants Appellees Answering Brief


22 PLT Reply brief1


STC 321 ORDER that plaintiff's motion at [315] is GRANTED i(2)


STC 15 Opinion Denying Mandamus


STC 300 P. Reply to Response to Motion re [277] Motion


STC 287 D Opp to Pl. Motion to Vacate Stay


STC 277 Motion to Lift Stay, Motion to Vacate


STC 8 Petitioners reply to answer to Writ of Mandamus petition


STC 7 1 D Response to Writ of Mandamus of Real Parties In Interest


STC 4 Order re Response to Mandamus


STC final mandamus petition 2


STC 229 ORDER FROM CHAMBERS denying Plaintiffs' Motion for Reconsideration


STC billing dispute form


STC 226 Motion for Reconsideration re Order on Motion to Certify Class


STC 223 Order and Opinion Compelling Arbitration


STC 175 Declaration of Elizabeth Parrish 172 Response to Motion


STC 188 P Response in Oppose Motion to Compel Arbitration and Dismiss P claims


STC 187 p Reply in Support MOTION to Certify Class


STC 172 D Response to P Motion for PI


STC FINAL PI BRIEF AZ


STC 69 2 Supplemental Memorandumn


STC 2nd amended stamped


STC ltr to Berman stamped 3.24.10


STC_Def to J Berman re arbitration 3-19-10


STC 2.22 Def Letter Reply re Venue


STC FINAL Letter Brief Opposing Transfer


STC 20 CASE MANAGEMENT PLAN


STC Def. letter mot to dismiss


STC 17 frist amended cplt


Complaint STC


Case Inquiry

"*" indicates required fields

Full Name*